Electrical Panel Permit Requirements The on-line permit is available for properties in moment-g.com through a residential zoning district. Zoning district indevelopment is obtainable on-line by clicking on E-Zoning.

You are watching: Ground wire size 200 amp service

This permit will certainly permit replacement of the existing electrical panel approximately a maximum of 200 amps in the exact same place.Note: Some properties in moment-g.com have actually an underground electric power feed from PG&E. If your residential or commercial property has actually an underground power feed, verify through PG&E that they have the right to provide increased power for a larger panel size.To identify if the proposed panel is sized appropriately for your needs OR if you want to watch if the proposed panel is huge enough for an all-electric residence, please complete an electric panel sizing spreadsheet. An electrical permit is forced for replacement and upgrade of the main electrical business panel before installation of the brand-new panel. Following is a listing of the basic requirements for electrical panel replacements based upon the 2019 The golden state Electrical Code. This directory is intfinished to administer basic information, call the Building Safety Division for any questions or additional information.General Requirements - The primary electrical company shall be installed via rigid conduit. Electrical metallic tubing might be provided wright here the service drop is attached to the structure. The organization entrance cable may be used, provided the apshowed fittings are used via the cable, such as a rain-tight service head or forming the cable goose-neck, taped or painted, and organized securely in place by a fitting apshowed for the purpose. (Article 230)The minimum size organization conduit shall be 1-1/4”. The minimum size company entrance wire shall be rated 100 amperes minimum for single family houses. For single household homes, the organization disattach means shall have a rating of much less than 100 amperes, 3-wire. A larger business may be required for brand-new homes or enhancements to existing homes based upon the actual pack calculations. (CEC 230.79(C))Service Entrance Conductors (Wires) – Conductors that extfinish throughout a roof shall have actually a minimum vertical clearance of 3’ above the roof surface for roofs sloped 4:12 or even more (18” clearance forced once conductors enter with the roof overhang/eave). The company head shall be situated so that the company drops, along with the open wires in between the service head and service drop, will have actually a minimum clearance of 10’ vertically over ground and 3’ radius from doors and windows. (Article 230.24)The neutral (grounded) conductor need to be identified through white tape at both terminals. (Article 200.6(B)(4))Service entrance conductors and cables shall be apshowed for a wet place and also, when exposed to straight sunlight, shall be provided and also marked as “sunlight resistant.” Service entrance conductors and conduit shall be sized according to the adhering to table (based on CEC Chapter 9 table 1):
SERVICE ENTRANCE CONDUCTORS SIZE AND RATING
Service or Feeder RatingCopper ConductorsAluminum or Copper-CladAluminumMinimum ConduitSize
100 Amps#4 AWG#2 AWG1 ¼ inch
125 Amps#2 AWG#1/0 AWG1 ¼ inch
150 Amps#1 AWG#2/0 AWG1 ¼ inch
200 Amps#2/0 AWG#4/0 AWG1 ½ inch
The grounding conductors should be determined by white or grey tape at both ends (200.6).Meter location - PG&E needs the elevation of the meter to be 48” to 66” above the ground. PG&E prohibits brand-new meters on exterior walls adjacent to bedrooms or bedroom closets. A minimum horizontal clearance of 36” from the gas meter and piping is required.

See more: Which Property Of Metals Makes Them Good Conductors Of Electricity

Working space - The clear functioning area in front of the panel shall be 30” wide by 36” deep through a minimum headroom clearance of 6’-6” (Article 110.26)Grounding of Services - Grounding shall consist of a consistent grounding electrode conductor run from the panel to a ground rod (grounding electrode) and to the cold water pipe. Grounding of the electric company at the primary water line need to be within the initially 5’ of water piping right into the structure. The underground water business shall not be provided as the grounding electrode without supplepsychological electrode. For brand-new frameworks and additions to existing structures, a concrete encased ground electrode shall be installed. This shall consist of 20’ of ½” bare or zinc-coated rebar or bare copper wire in the percent of the footing in contact through earth. (CEC 250.52(A)(3)(1) and also 250.52(A)(3)(2))For existing structures, the grounding electrode shall be nonferrous (copper), provided, and also not be much less than 5/8” in diameter. The electrode shall be installed such that at least 8’ of length is in contract through the soil. The top end of the electrode shall be flush with or below ground level unless the above-ground finish and also the grounding electrode conductor attachment is safeguarded against physical damages. (CEC 250.52 (A)(5), 250.64(B))The forced grounding electrode conductor (from electrode to panel) dimension is provided in the adhering to table:
GROUNDING ELECTRODE CONDUCTOR SIZING (Table 250.66)
Size of Main PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#8 AWG#6 AWG
150 Amps#6 AWG#4 AWG
200 Amps#4 AWG#2 AWG
Bonding - Bonding of the hot, cold, and also gas lines is required as soon as the electrical panel is replaced. Bonding of the warm, cold, and gas lines is compelled with water business replacements (if using a much less conductive product than is existing) and for all re-pipes. Bonding shall consist of a continuous bond jumper mounted at the water heater in between the warm, cold, and also gas lines. The bonding jumper shall be sized based upon the complying with table. (CEC250.4(A)(4))
BONDING JUMPER SIZING (Table 250.102(C)(1))
Size of Main PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#6 AWG#4 AWG
150 Amps#6 AWG#4 AWG
200 Amps#6 AWG#4 AWG
The Electrical Panel Permit is NOT accessible on-line if you are: Installing the new electric panel in a various location. Installing a new electrical panel larger than 200 amps. Installing added sub-panels through the brand-new electric panel. Perdeveloping additional electric work-related in conjunction via the new electric panel installation.
If any type of of the above problems use, the permit shall be issued at the One-Stop Permit Center, City Hall, 456 W Olive Avenue. Specific procedure indevelopment is easily accessible at the Building Division web site.
InspectionsA minimum of two inspections are required, a utility release and also a final. The utility release inspection need to be booked as soon as the new panel is installed and also all set to be hooked up the PG&E supply. The building inspector will certainly administer a energy release create which will certainly have to be provided to PG&E to have the supply hooked as much as the new panel. A wire lath inspection is compelled for stucco repairs. A final inspection have to be booked after every one of the job-related is complete.
*